RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028808 - Archived data from Mon, 03. May 2021 15:20:24 CEST


This is all the information about APD 2516028808. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028808
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.2 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 45
EP1 batch: 61
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.2419814 V     T = -25 °C: 343.0499451 V
Voltage for Gain 150: T = +20 °C: 386.0517494 V     T = -25 °C: 350.3946202 V
Voltage for Gain 200: T = +20 °C: 390.4238924 V     T = -25 °C: 354.5213833 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.560036958 V-1     T = -25 °C: 4.947253772 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.964981678 V-1     T = -25 °C: 9.174356867 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.85331575 V-1     T = -25 °C: 16.35901876 V-1
Break-through voltage: T = +20 °C: 405.8783519 V     T = -25 °C: 369.7979486 V
   
Notes: With Christopher Wenzel (Bochum) for test measurements.


Version history

Time Author Change comment
26. Oct 2021 15:12:31 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:20:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:30 CET jreher Updated box and position via API.
03. Feb 2021 18:22:03 CET jreher Updated box and position via API.
11. Aug 2020 17:45:25 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:55 CET jreher Updated APD location via API.
25. Nov 2019 17:15:54 CET jreher Updated box and position via API.
11. Nov 2019 18:42:30 CET spankonin Updated APD batch assignment via API.
04. Sep 2019 10:12:49 CEST markus.moritz
08. Jul 2019 14:56:29 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:44:42 CEST jreher Updated APD location via API.
17. May 2019 14:05:52 CEST jreher
03. Jan 2019 00:12:31 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.