Show Hamamatsu Avalanche Photo Diode 2516028799 - Archived data from Mon, 17. August 2020 15:53:05 CEST


This is all the information about APD 2516028799. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028799
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 375.8 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 36
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.1256681 V     T = -25 °C: 341.2671231 V
Voltage for Gain 150: T = +20 °C: 383.8710292 V     T = -25 °C: 348.5627625 V
Voltage for Gain 200: T = +20 °C: 388.2156021 V     T = -25 °C: 352.6327196 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612881353 V-1     T = -25 °C: 4.869588381 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.131152787 V-1     T = -25 °C: 10.1046732 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19523234 V-1     T = -25 °C: 16.18970611 V-1
Break-through voltage: T = +20 °C: 403.6533407 V     T = -25 °C: 367.8030747 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:29 CET jreher Updated box and position via API.
03. Feb 2021 18:22:02 CET jreher Updated box and position via API.
07. Oct 2020 12:16:06 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:05 CEST jreher Updated box and position via API.
11. Aug 2020 17:39:57 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:58 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:55 CET jreher Updated APD location via API.
25. Nov 2019 17:15:54 CET jreher Updated box and position via API.
17. Sep 2019 11:31:25 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:30 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 10:54:48 CEST markus.moritz
05. Jul 2019 13:44:41 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:32 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:31 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.