RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028796 - Archived data from Tue, 11. August 2020 17:39:56 CEST


This is all the information about APD 2516028796. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028796
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1910021071/2516028796
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: A08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 63
Position in Box: 33
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.9611015 V     T = -25 °C: 343.907044 V
Voltage for Gain 150: T = +20 °C: 386.8240305 V     T = -25 °C: 351.2912641 V
Voltage for Gain 200: T = +20 °C: 391.2105142 V     T = -25 °C: 355.4522342 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.595349865 V-1     T = -25 °C: 4.924783146 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.048673929 V-1     T = -25 °C: 9.198039535 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.06881117 V-1     T = -25 °C: 16.3869905 V-1
Break-through voltage: T = +20 °C: 404.2990993 V     T = -25 °C: 370.9018567 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:28 CET jreher Updated box and position via API.
03. Feb 2021 18:22:02 CET jreher Updated box and position via API.
11. Aug 2020 17:39:56 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:57 CEST jreher Updated APD characteristics via API.
03. Apr 2020 10:06:41 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:28 CET jreher Updated box and position via API.
27. Nov 2019 19:39:54 CET jreher Updated APD location via API.
25. Nov 2019 17:15:53 CET jreher Updated box and position via API.
17. Sep 2019 11:31:25 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:30 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 10:53:43 CEST markus.moritz
05. Jul 2019 13:44:41 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:32 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:31 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.