RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028782 - Archived data from Tue, 11. August 2020 17:32:54 CEST


This is all the information about APD 2516028782. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028782
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C10
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377.1 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 19
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.5581951 V     T = -25 °C: 342.6142917 V
Voltage for Gain 150: T = +20 °C: 385.2833245 V     T = -25 °C: 349.9034623 V
Voltage for Gain 200: T = +20 °C: 389.59234 V     T = -25 °C: 353.9792308 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.574790872 V-1     T = -25 °C: 4.820189605 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.056087588 V-1     T = -25 °C: 9.956745587 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.24428003 V-1     T = -25 °C: 16.24093647 V-1
Break-through voltage: T = +20 °C: 404.7042798 V     T = -25 °C: 368.5306006 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:27 CET jreher Updated box and position via API.
03. Feb 2021 18:22:00 CET jreher Updated box and position via API.
11. Aug 2020 17:39:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:53 CET jreher Updated APD location via API.
25. Nov 2019 17:15:52 CET jreher Updated box and position via API.
17. Sep 2019 11:31:24 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:50 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 10:44:24 CEST markus.moritz
05. Jul 2019 13:44:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:31 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:12 CET Tobias Imported from Hamamatsu datasheet.