RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028780 - Archived data from Tue, 11. August 2020 17:39:53 CEST


This is all the information about APD 2516028780. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028780
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2403026079/2516028780
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B10
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 63
Position in Box: 17
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.299615 V     T = -25 °C: 343.1918132 V
Voltage for Gain 150: T = +20 °C: 386.1035845 V     T = -25 °C: 350.5297188 V
Voltage for Gain 200: T = +20 °C: 390.4606146 V     T = -25 °C: 354.6335813 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.521737321 V-1     T = -25 °C: 4.897104092 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.937730204 V-1     T = -25 °C: 9.110497611 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.68409985 V-1     T = -25 °C: 16.16929086 V-1
Break-through voltage: T = +20 °C: 405.8518444 V     T = -25 °C: 369.8890476 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:26 CET jreher Updated box and position via API.
03. Feb 2021 18:22:00 CET jreher Updated box and position via API.
11. Aug 2020 17:39:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:54 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:59:51 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:31 CET jreher Updated box and position via API.
27. Nov 2019 19:39:53 CET jreher Updated APD location via API.
25. Nov 2019 17:15:52 CET jreher Updated box and position via API.
17. Sep 2019 11:31:24 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:50 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 10:41:28 CEST markus.moritz
05. Jul 2019 13:44:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:31 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.