RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028779 - Archived data from Wed, 03. February 2021 18:22:00 CET


This is all the information about APD 2516028779. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028779
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G10
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 376.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 16
EP1 batch: 40
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 17. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.1623247 V     T = -25 °C: 341.125858 V
Voltage for Gain 150: T = +20 °C: 383.9400636 V     T = -25 °C: 348.4286143 V
Voltage for Gain 200: T = +20 °C: 388.2812585 V     T = -25 °C: 352.5227727 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.600590132 V-1     T = -25 °C: 4.93422987 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.069202195 V-1     T = -25 °C: 9.174769872 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1139346 V-1     T = -25 °C: 16.37363224 V-1
Break-through voltage: T = +20 °C: 403.66706 V     T = -25 °C: 367.6827545 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:26 CET jreher Updated box and position via API.
03. Feb 2021 18:22:00 CET jreher Updated box and position via API.
11. Aug 2020 17:39:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:53 CET jreher Updated APD location via API.
25. Nov 2019 17:15:52 CET jreher Updated box and position via API.
17. Sep 2019 11:31:24 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:50 CEST spankonin Updated APD batch assignment via API.
25. Jul 2019 10:40:07 CEST markus.moritz
25. Jul 2019 10:31:43 CEST jreher
25. Jul 2019 10:31:31 CEST jreher
05. Jul 2019 13:44:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:30 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.