Subdetector specification:  
Serial: 2516028778
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.4 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 15
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.7726852 V     T = -25 °C: 345.4776042 V
Voltage for Gain 150: T = +20 °C: 388.5540314 V     T = -25 °C: 352.8475642 V
Voltage for Gain 200: T = +20 °C: 392.8791716 V     T = -25 °C: 356.9510623 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.434195362 V-1     T = -25 °C: 4.709038841 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.761286455 V-1     T = -25 °C: 9.906852218 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40748062 V-1     T = -25 °C: 16.01774777 V-1
Break-through voltage: T = +20 °C: 408.4430967 V     T = -25 °C: 372.0831733 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 16:08:01 CEST oafedulidis Assigned to capsule by script
05. Feb 2021 10:56:26 CET jreher Updated box and position via API.
03. Feb 2021 18:22:00 CET jreher Updated box and position via API.
18. Dec 2020 14:00:51 CET jreher Updated box and position via API.
11. Aug 2020 17:39:53 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:54 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:53 CET jreher Updated APD location via API.
25. Nov 2019 17:15:52 CET jreher Updated box and position via API.
17. Sep 2019 11:31:24 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:50 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:27:31 CEST markus.moritz
05. Jul 2019 13:44:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:30 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.