RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028765 - Archived data from Tue, 11. August 2020 17:32:51 CEST


This is all the information about APD 2516028765. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028765
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D06
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 63
Position in Box: 3
EP1 batch: 39
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.1825163 V     T = -25 °C: 343.3164053 V
Voltage for Gain 150: T = +20 °C: 384.9465021 V     T = -25 °C: 350.7867904 V
Voltage for Gain 200: T = +20 °C: 389.2751338 V     T = -25 °C: 354.7929385 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.624827303 V-1     T = -25 °C: 4.628208761 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.251384696 V-1     T = -25 °C: 10.50911733 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51739648 V-1     T = -25 °C: 15.37167735 V-1
Break-through voltage: T = +20 °C: 405.1210339 V     T = -25 °C: 368.5828161 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:10:03 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:41 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:25 CET jreher Updated box and position via API.
03. Feb 2021 18:21:58 CET jreher Updated box and position via API.
11. Aug 2020 17:39:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:32:51 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:52 CET jreher Updated APD location via API.
25. Nov 2019 17:15:51 CET jreher Updated box and position via API.
17. Sep 2019 11:31:00 CEST jgrochowski Updated APD batch assignment via API.
01. Aug 2019 12:11:49 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:21:38 CEST markus.moritz
05. Jul 2019 13:44:38 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:04 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.