RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2516028758 - Archived data from Thu, 28. November 2019 10:38:55 CET


This is all the information about APD 2516028758. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2516028758
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: At GSI for QE measurement
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 377 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Apr 2021 22:09:57 CEST jreher Updated APD characteristics via API.
30. Mar 2021 15:06:43 CEST jreher Updated APD batch assignment via API.
05. Feb 2021 10:56:22 CET jreher Updated box and position via API.
03. Feb 2021 18:21:56 CET jreher Updated box and position via API.
03. Feb 2021 18:06:48 CET jreher Updated APD location via API.
28. Nov 2019 10:38:55 CET jreher Updated APD location via API.
27. Nov 2019 19:39:44 CET jreher Updated APD location via API.
25. Nov 2019 17:15:49 CET jreher Updated box and position via API.
05. Jul 2019 13:44:33 CEST jreher Updated APD location via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.