RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028737 - Archived data from Wed, 03. February 2021 18:21:56 CET


This is all the information about APD 2515028737. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028737
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383.1 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 45
EP1 batch: 39
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9987168 V     T = -25 °C: 347.2427161 V
Voltage for Gain 150: T = +20 °C: 390.8219665 V     T = -25 °C: 354.6801302 V
Voltage for Gain 200: T = +20 °C: 395.1514409 V     T = -25 °C: 358.8416535 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.666466849 V-1     T = -25 °C: 4.834544151 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.40651459 V-1     T = -25 °C: 8.977376386 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.90360897 V-1     T = -25 °C: 16.21988202 V-1
Break-through voltage: T = +20 °C: 410.2780905 V     T = -25 °C: 373.6546242 V
   
Notes:


Version history

Time Author Change comment
15. Apr 2021 17:00:48 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:22 CET jreher Updated box and position via API.
03. Feb 2021 18:21:56 CET jreher Updated box and position via API.
11. Aug 2020 17:32:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:44 CET jreher Updated APD location via API.
25. Nov 2019 17:15:49 CET jreher Updated box and position via API.
01. Aug 2019 12:11:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:44:33 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:04 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.