RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028736 - Archived data from Wed, 07. October 2020 12:17:16 CEST


This is all the information about APD 2515028736. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028736
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028736/2317025595
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 4.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 62
Position in Box: 44
EP1 batch: 39
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.5182249 V     T = -25 °C: 348.7493256 V
Voltage for Gain 150: T = +20 °C: 392.3750068 V     T = -25 °C: 356.2167359 V
Voltage for Gain 200: T = +20 °C: 396.7504401 V     T = -25 °C: 360.3985401 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.453895797 V-1     T = -25 °C: 4.610787851 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.832942037 V-1     T = -25 °C: 9.368258389 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.63241434 V-1     T = -25 °C: 14.92094529 V-1
Break-through voltage: T = +20 °C: 411.9422276 V     T = -25 °C: 375.3756914 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:22 CET jreher Updated box and position via API.
03. Feb 2021 18:21:56 CET jreher Updated box and position via API.
07. Oct 2020 12:17:16 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:34 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:50 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:44 CET jreher Updated APD location via API.
25. Nov 2019 17:15:49 CET jreher Updated box and position via API.
01. Aug 2019 12:11:48 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:44:33 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:04 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:30 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.