RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028730 - Archived data from Wed, 03. February 2021 18:21:55 CET


This is all the information about APD 2515028730. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028730
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.1 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 38
EP1 batch: 39
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.6013479 V     T = -25 °C: 349.9196722 V
Voltage for Gain 150: T = +20 °C: 393.4635455 V     T = -25 °C: 357.383421 V
Voltage for Gain 200: T = +20 °C: 397.8042335 V     T = -25 °C: 361.5554484 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.386530456 V-1     T = -25 °C: 4.866055814 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.576761728 V-1     T = -25 °C: 9.04144142 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.84836749 V-1     T = -25 °C: 15.99054482 V-1
Break-through voltage: T = +20 °C: 412.5901842 V     T = -25 °C: 376.4021172 V
   
Notes:


Version history

Time Author Change comment
29. Apr 2021 17:02:55 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:26:24 CET jreher Updated box and position via API.
05. Feb 2021 10:56:21 CET jreher Updated box and position via API.
03. Feb 2021 18:21:55 CET jreher Updated box and position via API.
11. Aug 2020 17:32:49 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:44 CET jreher Updated APD location via API.
25. Nov 2019 17:15:48 CET jreher Updated box and position via API.
01. Aug 2019 12:12:03 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:12:53 CEST markus.moritz
05. Jul 2019 13:44:33 CEST jreher Updated APD location via API.
01. Jul 2019 14:30:03 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.