Show Hamamatsu Avalanche Photo Diode 2515028727 - Archived data from Tue, 11. August 2020 17:32:48 CEST
This is all the information about APD 2515028727. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2515028727 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C10 |
Break-through voltage: | 413 V |
Voltage for Gain 100 (T=+25°C): | 384.4 V |
Dark current: | 5.4 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 62 |
Position in Box: | 35 |
EP1 batch: | 39 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 384.7814829 V T = -25 °C: 349.0238532 V |
Voltage for Gain 150: | T = +20 °C: 392.6286249 V T = -25 °C: 356.4710234 V |
Voltage for Gain 200: | T = +20 °C: 396.9621622 V T = -25 °C: 360.6204548 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.670560778 V-1 T = -25 °C: 4.864044267 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.323997697 V-1 T = -25 °C: 8.954876803 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.57279385 V-1 T = -25 °C: 15.82225833 V-1 |
Break-through voltage: | T = +20 °C: 411.9775081 V T = -25 °C: 375.635295 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
10. Jun 2022 12:19:36 CEST | oafedulidis | Assigned to capsule by script |
03. May 2021 15:19:39 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:56:21 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:21:55 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:32:48 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:39:43 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:15:48 CET | jreher | Updated box and position via API. |
01. Aug 2019 12:12:02 CEST | spankonin | Updated APD batch assignment via API. |
24. Jul 2019 14:10:26 CEST | markus.moritz | |
05. Jul 2019 13:44:33 CEST | jreher | Updated APD location via API. |
01. Jul 2019 14:30:03 CEST | spankonin | Updated APD batch assignment via API. |
03. Jan 2019 00:12:29 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:11 CET | Tobias | Imported from Hamamatsu datasheet. |