RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028721 - Archived data from Tue, 11. August 2020 17:32:47 CEST


This is all the information about APD 2515028721. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028721
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 29
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 19. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.1997374 V     T = -25 °C: 350.1495383 V
Voltage for Gain 150: T = +20 °C: 394.0192786 V     T = -25 °C: 357.603182 V
Voltage for Gain 200: T = +20 °C: 398.3500734 V     T = -25 °C: 361.7534434 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.543157532 V-1     T = -25 °C: 4.805010126 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.087603312 V-1     T = -25 °C: 9.863727811 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16796036 V-1     T = -25 °C: 15.82170396 V-1
Break-through voltage: T = +20 °C: 412.7507158 V     T = -25 °C: 376.3476949 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:35 CEST oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:43 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:00 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:20 CET jreher Updated box and position via API.
03. Feb 2021 18:21:54 CET jreher Updated box and position via API.
11. Aug 2020 17:32:47 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:43 CET jreher Updated APD location via API.
25. Nov 2019 17:15:47 CET jreher Updated box and position via API.
01. Aug 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:08:01 CEST markus.moritz
05. Jul 2019 13:44:32 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:46 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.