RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028718 - Archived data from Wed, 03. February 2021 18:21:54 CET


This is all the information about APD 2515028718. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028718
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.6 V
Dark current: 5.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 26
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.3360049 V     T = -25 °C: 352.9498801 V
Voltage for Gain 150: T = +20 °C: 397.1217811 V     T = -25 °C: 360.4660306 V
Voltage for Gain 200: T = +20 °C: 401.4427826 V     T = -25 °C: 364.6558301 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.503775478 V-1     T = -25 °C: 4.846821068 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.917516621 V-1     T = -25 °C: 8.911136587 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.7551183 V-1     T = -25 °C: 15.67620328 V-1
Break-through voltage: T = +20 °C: 416.0179765 V     T = -25 °C: 379.5994136 V
   
Notes:


Version history

Time Author Change comment
27. Aug 2021 11:12:02 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:19 CET jreher Updated box and position via API.
03. Feb 2021 18:21:54 CET jreher Updated box and position via API.
11. Aug 2020 17:32:46 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:43 CET jreher Updated APD location via API.
25. Nov 2019 17:15:47 CET jreher Updated box and position via API.
01. Aug 2019 12:12:02 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:06:34 CEST markus.moritz
05. Jul 2019 13:44:32 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:46 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.