Show Hamamatsu Avalanche Photo Diode 2515028718 - Archived data from Tue, 11. August 2020 17:32:46 CEST
This is all the information about APD 2515028718. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2515028718 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | C13 |
Break-through voltage: | 417 V |
Voltage for Gain 100 (T=+25°C): | 388.6 V |
Dark current: | 5.6 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 62 |
Position in Box: | 26 |
EP1 batch: | 38 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | 16. Jul 2019 |
Sent for analysis after irradiation: | 19. Jul 2019 |
Return for assembly: | none |
Irradiation: | |
Date: | 16. Jul 2019 |
Dose used: | 37 Gy |
Temperature: | 20 °C |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | 17. Jul 2019 |
Temperature: | 80 °C |
Duration: | 48 h |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 389.3360049 V T = -25 °C: 352.9498801 V |
Voltage for Gain 150: | T = +20 °C: 397.1217811 V T = -25 °C: 360.4660306 V |
Voltage for Gain 200: | T = +20 °C: 401.4427826 V T = -25 °C: 364.6558301 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.503775478 V-1 T = -25 °C: 4.846821068 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 8.917516621 V-1 T = -25 °C: 8.911136587 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 15.7551183 V-1 T = -25 °C: 15.67620328 V-1 |
Break-through voltage: | T = +20 °C: 416.0179765 V T = -25 °C: 379.5994136 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
27. Aug 2021 11:12:02 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 10:56:19 CET | jreher | Updated box and position via API. |
03. Feb 2021 18:21:54 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:32:46 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 19:39:43 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:15:47 CET | jreher | Updated box and position via API. |
01. Aug 2019 12:12:02 CEST | spankonin | Updated APD batch assignment via API. |
24. Jul 2019 14:06:34 CEST | markus.moritz | |
05. Jul 2019 13:44:32 CEST | jreher | Updated APD location via API. |
01. Jul 2019 14:29:46 CEST | spankonin | Updated APD batch assignment via API. |
03. Jan 2019 00:12:29 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:11 CET | Tobias | Imported from Hamamatsu datasheet. |