RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028713 - Archived data from Fri, 05. February 2021 10:56:19 CET


This is all the information about APD 2515028713. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028713
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 21
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4608223 V     T = -25 °C: 346.9882557 V
Voltage for Gain 150: T = +20 °C: 390.2562786 V     T = -25 °C: 354.3812545 V
Voltage for Gain 200: T = +20 °C: 394.5971761 V     T = -25 °C: 358.5141207 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.494888793 V-1     T = -25 °C: 4.944261891 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.825664345 V-1     T = -25 °C: 9.140135455 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.46319566 V-1     T = -25 °C: 16.39449382 V-1
Break-through voltage: T = +20 °C: 409.2041962 V     T = -25 °C: 373.1997519 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 16:12:40 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:44 CEST jreher Updated box and position via API.
05. Feb 2021 10:56:19 CET jreher Updated box and position via API.
03. Feb 2021 18:21:53 CET jreher Updated box and position via API.
11. Aug 2020 17:32:45 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:42 CET jreher Updated APD location via API.
25. Nov 2019 17:15:46 CET jreher Updated box and position via API.
01. Aug 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 14:05:00 CEST markus.moritz
24. Jul 2019 14:04:55 CEST markus.moritz
05. Jul 2019 13:44:31 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:45 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:11 CET Tobias Imported from Hamamatsu datasheet.