RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028707 - Archived data from Fri, 05. February 2021 10:56:18 CET


This is all the information about APD 2515028707. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028707
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G11
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.3 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 15
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.6978967 V     T = -25 °C: 348.8880417 V
Voltage for Gain 150: T = +20 °C: 392.5208146 V     T = -25 °C: 356.3256893 V
Voltage for Gain 200: T = +20 °C: 396.8464608 V     T = -25 °C: 360.4844968 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.395218642 V-1     T = -25 °C: 4.922993198 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.602059962 V-1     T = -25 °C: 9.127293261 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.92255672 V-1     T = -25 °C: 16.25409511 V-1
Break-through voltage: T = +20 °C: 411.6224715 V     T = -25 °C: 375.4357171 V
   
Notes:


Version history

Time Author Change comment
25. Sep 2021 15:59:05 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:02:12 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:18 CET jreher Updated box and position via API.
03. Feb 2021 18:21:52 CET jreher Updated box and position via API.
11. Aug 2020 17:32:44 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:42 CET jreher Updated APD location via API.
25. Nov 2019 17:15:46 CET jreher Updated box and position via API.
01. Aug 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:58:29 CEST markus.moritz
05. Jul 2019 13:44:31 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:45 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.