RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028706 - Archived data from Wed, 03. February 2021 18:21:52 CET


This is all the information about APD 2515028706. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028706
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028706/2517028867
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.3 V
Dark current: 4.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 62
Position in Box: 14
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6549591 V     T = -25 °C: 346.1062588 V
Voltage for Gain 150: T = +20 °C: 389.4773128 V     T = -25 °C: 353.4866757 V
Voltage for Gain 200: T = +20 °C: 393.8076625 V     T = -25 °C: 357.5995958 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.405625492 V-1     T = -25 °C: 4.89977123 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.565608589 V-1     T = -25 °C: 8.994456675 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.91746208 V-1     T = -25 °C: 16.09152236 V-1
Break-through voltage: T = +20 °C: 407.6780524 V     T = -25 °C: 371.6931678 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:18 CET jreher Updated box and position via API.
03. Feb 2021 18:21:52 CET jreher Updated box and position via API.
11. Aug 2020 17:32:43 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:22:00 CEST jreher Assigned to capsule by script
19. Feb 2020 11:53:40 CET jreher Updated box and position via API.
27. Nov 2019 19:39:42 CET jreher Updated APD location via API.
25. Nov 2019 17:15:46 CET jreher Updated box and position via API.
01. Aug 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:57:16 CEST markus.moritz
05. Jul 2019 13:44:31 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:45 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.