RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028705 - Archived data from Wed, 03. February 2021 18:21:52 CET


This is all the information about APD 2515028705. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028705
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E14
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 13
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.3966178 V     T = -25 °C: 348.6294947 V
Voltage for Gain 150: T = +20 °C: 392.2238293 V     T = -25 °C: 356.0383475 V
Voltage for Gain 200: T = +20 °C: 396.5755446 V     T = -25 °C: 360.1816648 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533677681 V-1     T = -25 °C: 4.704106832 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.939725418 V-1     T = -25 °C: 9.529419575 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.76309595 V-1     T = -25 °C: 15.18047946 V-1
Break-through voltage: T = +20 °C: 412.2164623 V     T = -25 °C: 375.7582949 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:18 CET jreher Updated box and position via API.
03. Feb 2021 18:21:52 CET jreher Updated box and position via API.
11. Aug 2020 17:32:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:42 CET jreher Updated APD location via API.
25. Nov 2019 17:15:45 CET jreher Updated box and position via API.
01. Aug 2019 12:12:01 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:56:49 CEST markus.moritz
05. Jul 2019 13:44:31 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:45 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.