RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028701 - Archived data from Wed, 03. February 2021 18:21:52 CET


This is all the information about APD 2515028701. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028701
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 382.8 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 9
EP1 batch: 38
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.9969291 V     T = -25 °C: 347.3666212 V
Voltage for Gain 150: T = +20 °C: 390.8421938 V     T = -25 °C: 354.7843246 V
Voltage for Gain 200: T = +20 °C: 395.1954057 V     T = -25 °C: 358.9247685 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.606256381 V-1     T = -25 °C: 4.775088591 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.143392519 V-1     T = -25 °C: 9.694867059 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26828861 V-1     T = -25 °C: 15.43285282 V-1
Break-through voltage: T = +20 °C: 408.4013478 V     T = -25 °C: 372.6635974 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:18 CET jreher Updated box and position via API.
03. Feb 2021 18:21:52 CET jreher Updated box and position via API.
11. Aug 2020 17:32:43 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:41 CET jreher Updated APD location via API.
25. Nov 2019 17:15:45 CET jreher Updated box and position via API.
01. Aug 2019 12:12:00 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:50:59 CEST markus.moritz
05. Jul 2019 13:44:30 CEST jreher Updated APD location via API.
01. Jul 2019 14:29:44 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:29 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.