RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028688 - Archived data from Tue, 11. August 2020 17:32:41 CEST


This is all the information about APD 2515028688. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028688
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F06
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.7 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 62
Position in Box: 1
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.5289475 V     T = -25 °C: 343.1214145 V
Voltage for Gain 150: T = +20 °C: 386.2791232 V     T = -25 °C: 350.4349835 V
Voltage for Gain 200: T = +20 °C: 390.6091474 V     T = -25 °C: 354.5463029 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.575964848 V-1     T = -25 °C: 4.943752994 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.99800117 V-1     T = -25 °C: 9.413753065 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.1427162 V-1     T = -25 °C: 14.89365855 V-1
Break-through voltage: T = +20 °C: 406.3049692 V     T = -25 °C: 369.9876558 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:17 CET jreher Updated box and position via API.
03. Feb 2021 18:21:51 CET jreher Updated box and position via API.
11. Aug 2020 17:32:41 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:41 CET jreher Updated APD location via API.
25. Nov 2019 17:15:45 CET jreher Updated box and position via API.
01. Aug 2019 12:12:48 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:44:07 CEST markus.moritz
05. Jul 2019 13:44:30 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:56 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.