RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028685 - Archived data from Tue, 11. August 2020 17:32:41 CEST


This is all the information about APD 2515028685. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028685
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2401025942/2515028685
Unit: #1282 (barcode 1309013531)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.5 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: No
Storage Box: 61
Position in Box: 49
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.8081928 V     T = -25 °C: 346.167622 V
Voltage for Gain 150: T = +20 °C: 389.6739401 V     T = -25 °C: 353.6272055 V
Voltage for Gain 200: T = +20 °C: 394.0398054 V     T = -25 °C: 357.807371 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.360228853 V-1     T = -25 °C: 4.847643429 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.521309071 V-1     T = -25 °C: 8.950766467 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.8437075 V-1     T = -25 °C: 16.13960083 V-1
Break-through voltage: T = +20 °C: 409.298536 V     T = -25 °C: 373.0894617 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:15 CET jreher Updated box and position via API.
03. Feb 2021 18:21:48 CET jreher Updated box and position via API.
11. Aug 2020 17:32:41 CEST jreher Updated APD characteristics via API.
25. Jun 2020 11:26:04 CEST jreher Assigned to capsule by script
20. Feb 2020 13:34:35 CET jreher Updated box and position via API.
27. Nov 2019 19:39:34 CET jreher Updated APD location via API.
25. Nov 2019 17:15:44 CET jreher Updated box and position via API.
01. Aug 2019 12:12:48 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:40:29 CEST markus.moritz
12. Jul 2019 13:55:41 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:56 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.