RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028675 - Archived data from Mon, 03. May 2021 10:25:41 CEST


This is all the information about APD 2515028675. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028675
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 25
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5643032 V     T = -25 °C: 344.2137991 V
Voltage for Gain 150: T = +20 °C: 387.3288172 V     T = -25 °C: 351.489789 V
Voltage for Gain 200: T = +20 °C: 391.6643095 V     T = -25 °C: 355.5739501 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.522114512 V-1     T = -25 °C: 4.912374137 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.949633445 V-1     T = -25 °C: 9.31640376 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.85737502 V-1     T = -25 °C: 14.83684569 V-1
Break-through voltage: T = +20 °C: 406.9137628 V     T = -25 °C: 370.7102825 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 09:59:58 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:15 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:41 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:13 CET jreher Updated box and position via API.
03. Feb 2021 18:21:47 CET jreher Updated box and position via API.
11. Aug 2020 17:32:39 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:33 CET jreher Updated APD location via API.
25. Nov 2019 17:15:43 CET jreher Updated box and position via API.
01. Aug 2019 12:12:47 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 13:34:35 CEST markus.moritz
12. Jul 2019 13:55:40 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:55 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.