Serial: 2515028666
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1601016789/2515028666
Unit: #1516 (barcode 1309015252)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 5 nA
   
Screening Logistics:  
Available: No
Storage Box: 61
Position in Box: 30
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.1240053 V     T = -25 °C: 345.6207365 V
Voltage for Gain 150: T = +20 °C: 388.9367602 V     T = -25 °C: 352.9523496 V
Voltage for Gain 200: T = +20 °C: 393.2691202 V     T = -25 °C: 357.0472087 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.607635456 V-1     T = -25 °C: 4.766657238 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.26533957 V-1     T = -25 °C: 9.783367015 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.56217221 V-1     T = -25 °C: 15.86280231 V-1
Break-through voltage: T = +20 °C: 408.3552559 V     T = -25 °C: 372.0146864 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:12 CET jreher Updated box and position via API.
03. Feb 2021 18:21:46 CET jreher Updated box and position via API.
07. Oct 2020 14:22:39 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:52 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:37 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:32 CET jreher Updated APD location via API.
25. Nov 2019 17:15:42 CET jreher Updated box and position via API.
01. Aug 2019 12:12:47 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:25:11 CEST markus.moritz
12. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:55 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.