RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028659 - Archived data from Wed, 03. February 2021 18:21:45 CET


This is all the information about APD 2515028659. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028659
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.3 V
Dark current: 3.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 12
EP1 batch: 37
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5070141 V     T = -25 °C: 344.7373012 V
Voltage for Gain 150: T = +20 °C: 387.5139101 V     T = -25 °C: 352.1530912 V
Voltage for Gain 200: T = +20 °C: 391.9967006 V     T = -25 °C: 356.3050444 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.446034347 V-1     T = -25 °C: 4.761355626 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.678135543 V-1     T = -25 °C: 9.722265095 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.08016922 V-1     T = -25 °C: 15.58009052 V-1
Break-through voltage: T = +20 °C: 408.3464753 V     T = -25 °C: 372.0778527 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:15:47 CEST oafedulidis Assigned to capsule by script
27. Aug 2021 10:30:48 CEST oafedulidis Updated box and position via API.
03. May 2021 10:25:39 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:56:12 CET jreher Updated box and position via API.
03. Feb 2021 18:21:45 CET jreher Updated box and position via API.
11. Aug 2020 17:32:35 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:32 CET jreher Updated APD location via API.
25. Nov 2019 17:15:42 CET jreher Updated box and position via API.
01. Aug 2019 12:13:06 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:15:36 CEST markus.moritz
12. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:54 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:27 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.