RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028657 - Archived data from Wed, 03. February 2021 18:21:45 CET


This is all the information about APD 2515028657. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028657
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028657/2515028722
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.7 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 61
Position in Box: 21
EP1 batch: 36
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.3414374 V     T = -25 °C: 346.1374992 V
Voltage for Gain 150: T = +20 °C: 389.2426861 V     T = -25 °C: 353.5399706 V
Voltage for Gain 200: T = +20 °C: 393.6499798 V     T = -25 °C: 357.6981184 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.420512148 V-1     T = -25 °C: 4.897339007 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.946928933 V-1     T = -25 °C: 9.206756774 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.93754662 V-1     T = -25 °C: 14.70838589 V-1
Break-through voltage: T = +20 °C: 409.3971578 V     T = -25 °C: 373.3122609 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:56:11 CET jreher Updated box and position via API.
03. Feb 2021 18:21:45 CET jreher Updated box and position via API.
11. Aug 2020 17:32:34 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:53:31 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:09 CET jreher Updated box and position via API.
27. Nov 2019 19:39:32 CET jreher Updated APD location via API.
25. Nov 2019 17:15:42 CET jreher Updated box and position via API.
01. Aug 2019 12:13:05 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:12:45 CEST markus.moritz
12. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:51 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:27 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.