RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0724007172 - Archived data from Tue, 11. August 2020 17:34:05 CEST


This is all the information about APD 0724007172. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0724007172
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D13
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 13.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 187
Position in Box: 41
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 18. Apr 2019
Sent for analysis after irradiation: 09. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 04. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 05. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.7162915 V     T = -25 °C: 346.0011103 V
Voltage for Gain 150: T = +20 °C: 389.6062498 V     T = -25 °C: 353.3350398 V
Voltage for Gain 200: T = +20 °C: 393.9905244 V     T = -25 °C: 357.463001 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.647039774 V-1     T = -25 °C: 4.889455816 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.124879673 V-1     T = -25 °C: 9.024684678 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.09275613 V-1     T = -25 °C: 16.12610275 V-1
Break-through voltage: T = +20 °C: 409.0999627 V     T = -25 °C: 372.3650234 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:12:30 CET jreher Updated box and position via API.
07. Oct 2020 12:17:43 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:48 CEST jreher Updated box and position via API.
11. Aug 2020 17:34:05 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:13 CET jreher Updated box and position via API.
27. Nov 2019 20:02:08 CET jreher Updated APD location via API.
25. Nov 2019 17:25:38 CET jreher Updated box and position via API.
13. Aug 2019 12:17:04 CEST jreher Updated APD location via API.
05. Aug 2019 17:05:34 CEST jreher Updated APD batch assignment via API.
10. Jul 2019 11:06:17 CEST markus.moritz
22. Jun 2016 15:22:30 CEST Tobias Imported from Hamamatsu datasheet.