RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028637 - Archived data from Tue, 11. August 2020 17:32:33 CEST


This is all the information about APD 2514028637. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028637
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F15
Break-through voltage: 404 V
Voltage for Gain 100 (T=+25°C): 377.4 V
Dark current: 9.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 61
Position in Box: 13
EP1 batch: 36
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4438354 V     T = -25 °C: 342.3740004 V
Voltage for Gain 150: T = +20 °C: 385.3073072 V     T = -25 °C: 349.7377605 V
Voltage for Gain 200: T = +20 °C: 389.7074045 V     T = -25 °C: 353.8678038 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.568777005 V-1     T = -25 °C: 4.955790373 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.008292752 V-1     T = -25 °C: 9.189415036 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.07403768 V-1     T = -25 °C: 14.58692245 V-1
Break-through voltage: T = +20 °C: 403.2007054 V     T = -25 °C: 367.9502303 V
   
Notes:


Version history

Time Author Change comment
17. Jun 2021 19:18:55 CEST oafedulidis Assigned to capsule by script
16. Feb 2021 12:28:19 CET jreher Updated box and position via API.
05. Feb 2021 10:56:11 CET jreher Updated box and position via API.
03. Feb 2021 18:21:44 CET jreher Updated box and position via API.
11. Aug 2020 17:32:33 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:31 CET jreher Updated APD location via API.
25. Nov 2019 17:15:41 CET jreher Updated box and position via API.
01. Aug 2019 12:13:05 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:10:15 CEST markus.moritz
12. Jul 2019 13:55:38 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:51 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:27 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.