RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028610 - Archived data from Tue, 11. August 2020 17:32:28 CEST


This is all the information about APD 2514028610. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028610
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2415027123/2514028610
Unit: #1061 (barcode 1309011483)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: G04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383.9 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 178
Position in Box: 37
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0830849 V     T = -25 °C: 347.7255683 V
Voltage for Gain 150: T = +20 °C: 391.0019927 V     T = -25 °C: 355.1680475 V
Voltage for Gain 200: T = +20 °C: 395.403627 V     T = -25 °C: 359.3475545 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.578451945 V-1     T = -25 °C: 4.647055448 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.036778801 V-1     T = -25 °C: 9.395915744 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08409536 V-1     T = -25 °C: 14.89524331 V-1
Break-through voltage: T = +20 °C: 410.8142277 V     T = -25 °C: 374.2449565 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:16 CET jreher Updated box and position via API.
11. Aug 2020 17:32:28 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:33 CEST jreher Assigned to capsule by script
13. Feb 2020 14:24:00 CET jreher Updated box and position via API.
27. Nov 2019 20:00:28 CET jreher Updated APD location via API.
25. Nov 2019 17:24:56 CET jreher Updated box and position via API.
30. Jul 2019 15:20:20 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:52:58 CEST markus.moritz
05. Jul 2019 14:50:23 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:18 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.