RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028608 - Archived data from Tue, 11. August 2020 17:32:28 CEST


This is all the information about APD 2514028608. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028608
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E15
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.3 V
Dark current: 10.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 35
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.1605296 V     T = -25 °C: 343.0163323 V
Voltage for Gain 150: T = +20 °C: 386.0322315 V     T = -25 °C: 350.372407 V
Voltage for Gain 200: T = +20 °C: 390.4263457 V     T = -25 °C: 354.5006272 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.561323633 V-1     T = -25 °C: 4.976914085 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.022527346 V-1     T = -25 °C: 9.272985452 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.98843998 V-1     T = -25 °C: 14.76937812 V-1
Break-through voltage: T = +20 °C: 406.3648732 V     T = -25 °C: 369.7221968 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:16 CET jreher Updated box and position via API.
07. Oct 2020 12:18:36 CEST jreher Assigned to capsule by script
17. Aug 2020 15:54:00 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:28 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:28 CET jreher Updated APD location via API.
25. Nov 2019 17:24:55 CET jreher Updated box and position via API.
30. Jul 2019 15:20:20 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:51:40 CEST markus.moritz
05. Jul 2019 14:50:23 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:18 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.