RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028603 - Archived data from Fri, 05. February 2021 11:11:15 CET


This is all the information about APD 2514028603. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028603
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C15
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 379.7 V
Dark current: 10.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 19
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.5928801 V     T = -25 °C: 341.0136525 V
Voltage for Gain 150: T = +20 °C: 387.431852 V     T = -25 °C: 349.1030458 V
Voltage for Gain 200: T = +20 °C: 391.8102693 V     T = -25 °C: 353.7133522 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.425177219 V-1     T = -25 °C: 4.582792713 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.727214271 V-1     T = -25 °C: 8.621556383 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.33178691 V-1     T = -25 °C: 14.71486799 V-1
Break-through voltage: T = +20 °C: 405.8853767 V     T = -25 °C: 369.8997113 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:48 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:15 CET jreher Updated box and position via API.
11. Aug 2020 17:32:27 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:28 CET jreher Updated APD location via API.
25. Nov 2019 17:24:55 CET jreher Updated box and position via API.
30. Jul 2019 15:20:19 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:50:21 CEST markus.moritz
05. Jul 2019 14:50:23 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:17 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.