RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028601 - Archived data from Wed, 28. April 2021 13:27:31 CEST


This is all the information about APD 2514028601. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028601
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 377.6 V
Dark current: 6.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 28
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.4618243 V     T = -25 °C: 342.1854892 V
Voltage for Gain 150: T = +20 °C: 385.2358796 V     T = -25 °C: 349.5288312 V
Voltage for Gain 200: T = +20 °C: 389.5787107 V     T = -25 °C: 353.6439319 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.5144283 V-1     T = -25 °C: 4.912479525 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.917026435 V-1     T = -25 °C: 9.098304047 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.6565082 V-1     T = -25 °C: 16.42340453 V-1
Break-through voltage: T = +20 °C: 405.1187068 V     T = -25 °C: 368.7272827 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:25:41 CEST oafedulidis Assigned to capsule by script
28. Apr 2021 13:27:31 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:15 CET jreher Updated box and position via API.
11. Aug 2020 17:32:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:28 CET jreher Updated APD location via API.
25. Nov 2019 17:24:55 CET jreher Updated box and position via API.
30. Jul 2019 15:20:19 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:49:52 CEST markus.moritz
05. Jul 2019 14:50:23 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:17 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.