RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028598 - Archived data from Fri, 05. February 2021 11:11:14 CET


This is all the information about APD 2514028598. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028598
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 9.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 25
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.0275673 V     T = -25 °C: 344.911624 V
Voltage for Gain 150: T = +20 °C: 387.9226339 V     T = -25 °C: 352.2654707 V
Voltage for Gain 200: T = +20 °C: 392.3212888 V     T = -25 °C: 356.4013618 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.619183035 V-1     T = -25 °C: 5.035246407 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.135214481 V-1     T = -25 °C: 9.436466874 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.31325723 V-1     T = -25 °C: 15.00161261 V-1
Break-through voltage: T = +20 °C: 408.0924365 V     T = -25 °C: 371.4915387 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:21:01 CET jreher Assigned to capsule by script
05. Feb 2021 11:11:14 CET jreher Updated box and position via API.
18. Dec 2020 13:59:24 CET jreher Updated box and position via API.
11. Aug 2020 17:32:26 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:27 CET jreher Updated APD location via API.
25. Nov 2019 17:24:55 CET jreher Updated box and position via API.
30. Jul 2019 15:20:19 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:49:08 CEST markus.moritz
05. Jul 2019 14:50:22 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:17 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.