RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028589 - Archived data from Wed, 16. June 2021 15:52:28 CEST


This is all the information about APD 2514028589. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028589
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385.9 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 12
EP1 batch: 35
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.140323 V     T = -25 °C: 350.4000691 V
Voltage for Gain 150: T = +20 °C: 393.1015478 V     T = -25 °C: 357.8300949 V
Voltage for Gain 200: T = +20 °C: 397.5428402 V     T = -25 °C: 362.002353 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.552593312 V-1     T = -25 °C: 4.798472367 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.940320529 V-1     T = -25 °C: 8.905454814 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.13236688 V-1     T = -25 °C: 16.22566646 V-1
Break-through voltage: T = +20 °C: 410.9116109 V     T = -25 °C: 376.8650823 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 10:34:59 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:03:30 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:48 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:52:28 CEST oafedulidis Updated box and position via API.
03. May 2021 10:24:47 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:13 CET jreher Updated box and position via API.
11. Aug 2020 17:32:23 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:27 CET jreher Updated APD location via API.
25. Nov 2019 17:24:54 CET jreher Updated box and position via API.
30. Jul 2019 15:20:00 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:45:19 CEST markus.moritz
05. Jul 2019 14:50:22 CEST jreher Updated APD location via API.
01. Jul 2019 14:24:16 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:26 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.