RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028581 - Archived data from Mon, 15. February 2021 15:37:21 CET


This is all the information about APD 2514028581. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028581
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2514028581/2520029079
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 382.1 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: No
Storage Box: 178
Position in Box: 10
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.2223147 V     T = -25 °C: 347.1043255 V
Voltage for Gain 150: T = +20 °C: 389.9829891 V     T = -25 °C: 354.3726803 V
Voltage for Gain 200: T = +20 °C: 394.295623 V     T = -25 °C: 358.4489277 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.721608939 V-1     T = -25 °C: 5.138800909 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.399510218 V-1     T = -25 °C: 9.621385433 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99314421 V-1     T = -25 °C: 15.55800805 V-1
Break-through voltage: T = +20 °C: 409.6033913 V     T = -25 °C: 373.1962439 V
   
Notes:


Version history

Time Author Change comment
16. Feb 2021 12:25:01 CET jreher Updated box and position via API.
15. Feb 2021 15:37:21 CET jreher Assigned to capsule by script
05. Feb 2021 11:11:13 CET jreher Updated box and position via API.
11. Aug 2020 17:32:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:26 CET jreher Updated APD location via API.
25. Nov 2019 17:24:53 CET jreher Updated box and position via API.
30. Jul 2019 15:20:00 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:43:19 CEST markus.moritz
23. Jul 2019 15:28:51 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:21 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.