Subdetector specification:  
Serial: 2514028579
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E05
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.9 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 6
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.6215159 V     T = -25 °C: 346.5210389 V
Voltage for Gain 150: T = +20 °C: 389.4391435 V     T = -25 °C: 353.805489 V
Voltage for Gain 200: T = +20 °C: 393.7946801 V     T = -25 °C: 357.8775989 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.533645908 V-1     T = -25 °C: 4.841120781 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.791928322 V-1     T = -25 °C: 9.169966433 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.05940968 V-1     T = -25 °C: 14.70815219 V-1
Break-through voltage: T = +20 °C: 409.3361729 V     T = -25 °C: 372.6952655 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:13 CET jreher Updated box and position via API.
11. Aug 2020 17:32:22 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:26 CET jreher Updated APD location via API.
25. Nov 2019 17:24:53 CET jreher Updated box and position via API.
30. Jul 2019 15:19:59 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 09:42:09 CEST markus.moritz
23. Jul 2019 15:28:51 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:21 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:50 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.