Show Hamamatsu Avalanche Photo Diode 2514028575 - Archived data from Fri, 05. February 2021 11:11:12 CET
This is all the information about APD 2514028575. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2514028575 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | D05 |
Break-through voltage: | 410 V |
Voltage for Gain 100 (T=+25°C): | 381.6 V |
Dark current: | 5.5 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 178 |
Position in Box: | 4 |
EP1 batch: | 34 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 381.1503495 V T = -25 °C: 346.266353 V |
Voltage for Gain 150: | T = +20 °C: 389.0439261 V T = -25 °C: 353.5334719 V |
Voltage for Gain 200: | T = +20 °C: 393.4069497 V T = -25 °C: 357.5917143 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.613242177 V-1 T = -25 °C: 5.021143029 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.289225345 V-1 T = -25 °C: 9.451165735 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.61130855 V-1 T = -25 °C: 15.3379454 V-1 |
Break-through voltage: | T = +20 °C: 409.2271959 V T = -25 °C: 372.4805733 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
03. May 2021 10:24:46 CEST | oafedulidis | Updated box and position via API. |
05. Feb 2021 11:11:12 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:32:21 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 20:00:26 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:24:53 CET | jreher | Updated box and position via API. |
30. Jul 2019 15:19:59 CEST | spankonin | Updated APD batch assignment via API. |
23. Jul 2019 15:28:51 CEST | jreher | Updated APD batch assignment via API. |
05. Jul 2019 14:50:21 CEST | jreher | Updated APD location via API. |
24. Jun 2019 16:06:49 CEST | jgrochowski | Updated APD batch assignment via API. |
03. Jan 2019 00:12:25 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:09 CET | Tobias | Imported from Hamamatsu datasheet. |