RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2514028573 - Archived data from Tue, 11. August 2020 17:32:21 CEST


This is all the information about APD 2514028573. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2514028573
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 5.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 178
Position in Box: 2
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 383.0786848 V     T = -25 °C: 347.5210807 V
Voltage for Gain 150: T = +20 °C: 390.8937537 V     T = -25 °C: 354.9231075 V
Voltage for Gain 200: T = +20 °C: 395.2206505 V     T = -25 °C: 359.0427087 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.692179738 V-1     T = -25 °C: 4.815274786 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.532510261 V-1     T = -25 °C: 8.918572504 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.10917251 V-1     T = -25 °C: 16.30331104 V-1
Break-through voltage: T = +20 °C: 410.6204912 V     T = -25 °C: 374.0439518 V
   
Notes:


Version history

Time Author Change comment
03. May 2021 10:24:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:11:12 CET jreher Updated box and position via API.
11. Aug 2020 17:32:21 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:26 CET jreher Updated APD location via API.
25. Nov 2019 17:24:53 CET jreher Updated box and position via API.
30. Jul 2019 15:19:59 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 15:28:51 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:21 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:49 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:09 CET Tobias Imported from Hamamatsu datasheet.