Show Hamamatsu Avalanche Photo Diode 2513028546 - Archived data from Wed, 07. October 2020 12:18:34 CEST


This is all the information about APD 2513028546. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028546
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2516028792/2513028546
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 380.9 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 181
Position in Box: 34
EP1 batch: 34
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.3463262 V     T = -25 °C: 345.164751 V
Voltage for Gain 150: T = +20 °C: 388.283418 V     T = -25 °C: 352.6583352 V
Voltage for Gain 200: T = +20 °C: 392.7352345 V     T = -25 °C: 356.8579617 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.502363947 V-1     T = -25 °C: 4.863237889 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.750037362 V-1     T = -25 °C: 8.957209302 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30331323 V-1     T = -25 °C: 15.95526971 V-1
Break-through voltage: T = +20 °C: 408.8177083 V     T = -25 °C: 372.63153 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:40 CET jreher Updated box and position via API.
07. Oct 2020 12:18:34 CEST jreher Assigned to capsule by script
17. Aug 2020 15:53:59 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:18 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:01:01 CET jreher Updated APD location via API.
25. Nov 2019 17:25:09 CET jreher Updated box and position via API.
30. Jul 2019 15:19:41 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 15:28:49 CEST jreher Updated APD batch assignment via API.
05. Jul 2019 14:50:48 CEST jreher Updated APD location via API.
24. Jun 2019 16:06:48 CEST jgrochowski Updated APD batch assignment via API.
24. Jun 2019 16:06:48 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:25 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.