Show Hamamatsu Avalanche Photo Diode 2513028518 - Archived data from Tue, 11. August 2020 17:32:12 CEST
This is all the information about APD 2513028518. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2513028518 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | assigned to 2513028518/2312025182 |
Unit: | unassigned |
Preamp: | 0 |
Current location: | Bochum |
Installation information: | |
Label: | blue |
Manufacturer information: | |
Wafer position: | B10 |
Break-through voltage: | 411 V |
Voltage for Gain 100 (T=+25°C): | 383.4 V |
Dark current: | 5.6 nA |
Screening Logistics: | |
Available: | No |
Storage Box: | 181 |
Position in Box: | 6 |
EP1 batch: | 33 |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: 383.9232447 V T = -25 °C: 347.9729893 V |
Voltage for Gain 150: | T = +20 °C: 391.7976126 V T = -25 °C: 355.4587236 V |
Voltage for Gain 200: | T = +20 °C: 396.1512098 V T = -25 °C: 359.6619751 V |
Gain/Voltage slope at M = 100: | T = +20 °C: 4.63622274 V-1 T = -25 °C: 4.919642351 V-1 |
Gain/Voltage slope at M = 150: | T = +20 °C: 9.324748765 V-1 T = -25 °C: 9.064108976 V-1 |
Gain/Voltage slope at M = 200: | T = +20 °C: 14.67372156 V-1 T = -25 °C: 16.38710749 V-1 |
Break-through voltage: | T = +20 °C: 410.2353656 V T = -25 °C: 373.9864345 V |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
05. Feb 2021 11:11:37 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:32:12 CEST | jreher | Updated APD characteristics via API. |
03. Apr 2020 09:46:33 CEST | jreher | Assigned to capsule by script |
13. Feb 2020 14:24:00 CET | jreher | Updated box and position via API. |
27. Nov 2019 20:00:59 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:25:07 CET | jreher | Updated box and position via API. |
30. Jul 2019 15:19:39 CEST | spankonin | Updated APD batch assignment via API. |
05. Jul 2019 14:50:45 CEST | jreher | Updated APD location via API. |
24. Jun 2019 16:09:55 CEST | jgrochowski | Updated APD batch assignment via API. |
03. Jan 2019 00:12:24 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:08 CET | Tobias | Imported from Hamamatsu datasheet. |