RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028514 - Archived data from Wed, 27. November 2019 20:00:59 CET


This is all the information about APD 2513028514. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028514
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379.6 V
Dark current: 6.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 181
Position in Box: 2
EP1 batch: 33
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:36 CET jreher Updated box and position via API.
11. Aug 2020 17:32:11 CEST jreher Updated APD characteristics via API.
31. Mar 2020 08:52:36 CEST jreher Assigned to capsule by script
13. Feb 2020 14:21:51 CET jreher Updated box and position via API.
27. Nov 2019 20:00:59 CET jreher Updated APD location via API.
25. Nov 2019 17:25:07 CET jreher Updated box and position via API.
30. Jul 2019 15:19:28 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:45 CEST jreher Updated APD location via API.
24. Jun 2019 16:09:55 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:24 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.