RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028508 - Archived data from Tue, 11. August 2020 17:32:10 CEST


This is all the information about APD 2513028508. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028508
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C14
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 386 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 46
EP1 batch: 32
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.5203222 V     T = -25 °C: 349.9914618 V
Voltage for Gain 150: T = +20 °C: 394.3167119 V     T = -25 °C: 357.5379352 V
Voltage for Gain 200: T = +20 °C: 398.6495049 V     T = -25 °C: 361.7884986 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.582612411 V-1     T = -25 °C: 4.942829878 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.129363932 V-1     T = -25 °C: 9.22266538 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.3955639 V-1     T = -25 °C: 14.21027027 V-1
Break-through voltage: T = +20 °C: 412.8348042 V     T = -25 °C: 376.4435944 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:33 CET jreher Updated box and position via API.
11. Aug 2020 17:32:10 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:51 CET jreher Updated APD location via API.
25. Nov 2019 17:25:06 CET jreher Updated box and position via API.
30. Jul 2019 15:19:27 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 14:50:40 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:12 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:23 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:08 CET Tobias Imported from Hamamatsu datasheet.