RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028503 - Archived data from Tue, 11. August 2020 17:32:09 CEST


This is all the information about APD 2513028503. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028503
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D05
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 378.9 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 41
EP1 batch: 32
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 378.3724129 V     T = -25 °C: 343.9692962 V
Voltage for Gain 150: T = +20 °C: 386.3743338 V     T = -25 °C: 351.2903242 V
Voltage for Gain 200: T = +20 °C: 390.8566545 V     T = -25 °C: 355.3742146 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.416336463 V-1     T = -25 °C: 4.962407488 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.772928567 V-1     T = -25 °C: 9.759557569 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.55188836 V-1     T = -25 °C: 15.66700736 V-1
Break-through voltage: T = +20 °C: 407.2329328 V     T = -25 °C: 370.7487397 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:33 CET jreher Updated box and position via API.
07. Oct 2020 12:26:25 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:34 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:09 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:34:54 CET jreher Updated box and position via API.
27. Nov 2019 20:00:51 CET jreher Updated APD location via API.
25. Nov 2019 17:25:05 CET jreher Updated box and position via API.
30. Jul 2019 15:19:27 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 11:05:40 CEST markus.moritz
05. Jul 2019 14:50:40 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:12 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:23 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.