Show Hamamatsu Avalanche Photo Diode 2513028492 - Archived data from Fri, 12. January 2018 13:12:07 CET
This is all the information about APD 2513028492. If it is wrong, edit the data.
Subdetector specification: | |
---|---|
Serial: | 2513028492 |
Type: | Hamamatsu Avalanche Photo Diode |
Detector: | unassigned |
Unit: | unassigned |
Preamp: | 0 |
Current location: | unknown |
Installation information: | |
Label: | none |
Manufacturer information: | |
Wafer position: | E04 |
Break-through voltage: | 407 V |
Voltage for Gain 100 (T=+25°C): | 377.9 V |
Dark current: | 7.1E-9 nA |
Screening Logistics: | |
Available: | Yes |
Storage Box: | 180 |
Position in Box: | 32 |
EP1 batch: | none |
EP1 batch after irradiation: | none |
Shipment: | |
Grid number: | none |
Position in grid: | none |
Arrival for irradiation: | none |
Sent for analysis after irradiation: | none |
Return for assembly: | none |
Irradiation: | |
Date: | none |
Dose used: | none |
Temperature: | none |
Position: | none |
Bias voltage: | none |
Annealing: | |
Date: | none |
Temperature: | none |
Duration: | none |
Measurement results: | |
Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
Break-through voltage: | T = +20 °C: none T = -25 °C: none |
Notes: |
Version history
Time | Author | Change comment |
---|---|---|
25. Sep 2021 15:59:55 CEST | oafedulidis | Assigned to capsule by script |
21. Apr 2021 11:03:12 CEST | jreher | Updated box and position via API. |
05. Feb 2021 11:11:32 CET | jreher | Updated box and position via API. |
11. Aug 2020 17:32:07 CEST | jreher | Updated APD characteristics via API. |
27. Nov 2019 20:00:50 CET | jreher | Updated APD location via API. |
25. Nov 2019 17:25:05 CET | jreher | Updated box and position via API. |
30. Jul 2019 15:19:26 CEST | spankonin | Updated APD batch assignment via API. |
23. Jul 2019 11:03:09 CEST | markus.moritz | |
05. Jul 2019 14:50:39 CEST | jreher | Updated APD location via API. |
24. Jun 2019 16:13:11 CEST | jgrochowski | Updated APD batch assignment via API. |
03. Jan 2019 00:12:23 CET | Tobias | Corrected dark current unit. |
12. Jan 2018 13:12:07 CET | Tobias | Imported from Hamamatsu datasheet. |