RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2513028487 - Archived data from Tue, 11. August 2020 17:32:06 CEST


This is all the information about APD 2513028487. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2513028487
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 376.7 V
Dark current: 6.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 27
EP1 batch: 32
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.7648139 V     T = -25 °C: 342.1205131 V
Voltage for Gain 150: T = +20 °C: 384.5548083 V     T = -25 °C: 349.3493435 V
Voltage for Gain 200: T = +20 °C: 388.9032214 V     T = -25 °C: 353.4081277 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.404529638 V-1     T = -25 °C: 5.159227992 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.771412927 V-1     T = -25 °C: 9.656810053 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.83129634 V-1     T = -25 °C: 15.65800367 V-1
Break-through voltage: T = +20 °C: 404.5531592 V     T = -25 °C: 368.4593248 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:31 CET jreher Updated box and position via API.
07. Oct 2020 12:17:42 CEST jreher Assigned to capsule by script
17. Aug 2020 15:50:47 CEST jreher Updated box and position via API.
11. Aug 2020 17:32:06 CEST jreher Updated APD characteristics via API.
20. Feb 2020 13:35:12 CET jreher Updated box and position via API.
27. Nov 2019 20:00:50 CET jreher Updated APD location via API.
25. Nov 2019 17:25:04 CET jreher Updated box and position via API.
30. Jul 2019 15:19:26 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 11:01:39 CEST markus.moritz
05. Jul 2019 14:50:39 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:11 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.