RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028466 - Archived data from Tue, 11. August 2020 17:32:06 CEST


This is all the information about APD 2512028466. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028466
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 407 V
Voltage for Gain 100 (T=+25°C): 378.4 V
Dark current: 6.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 24
EP1 batch: 32
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.8688638 V     T = -25 °C: 343.5422692 V
Voltage for Gain 150: T = +20 °C: 385.7354015 V     T = -25 °C: 350.7327764 V
Voltage for Gain 200: T = +20 °C: 390.1037652 V     T = -25 °C: 354.7475526 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.393169489 V-1     T = -25 °C: 4.873297159 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.793618284 V-1     T = -25 °C: 9.481853499 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.16918224 V-1     T = -25 °C: 15.28013525 V-1
Break-through voltage: T = +20 °C: 405.9709313 V     T = -25 °C: 369.6288518 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:31 CET jreher Updated box and position via API.
11. Aug 2020 17:32:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:50 CET jreher Updated APD location via API.
25. Nov 2019 17:25:04 CET jreher Updated box and position via API.
30. Jul 2019 15:19:26 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 11:01:24 CEST markus.moritz
05. Jul 2019 14:50:38 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:11 CEST jgrochowski Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.