RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028456 - Archived data from Tue, 11. August 2020 17:32:04 CEST


This is all the information about APD 2512028456. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028456
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 378.1 V
Dark current: 5.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 14
EP1 batch: 31
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 377.3464777 V     T = -25 °C: 342.5053432 V
Voltage for Gain 150: T = +20 °C: 385.1879277 V     T = -25 °C: 349.8464746 V
Voltage for Gain 200: T = +20 °C: 389.5601365 V     T = -25 °C: 353.9480846 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.520671084 V-1     T = -25 °C: 4.854687173 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.941983533 V-1     T = -25 °C: 9.851988532 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.93729607 V-1     T = -25 °C: 16.02121327 V-1
Break-through voltage: T = +20 °C: 405.2087229 V     T = -25 °C: 369.2598428 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 09:32:20 CET oafedulidis Assigned to capsule by script
09. Dec 2021 13:11:21 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:11:29 CET jreher Updated box and position via API.
11. Aug 2020 17:32:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:49 CET jreher Updated APD location via API.
25. Nov 2019 17:25:03 CET jreher Updated box and position via API.
30. Jul 2019 15:19:13 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:58:19 CEST markus.moritz
23. Jul 2019 10:58:15 CEST markus.moritz
05. Jul 2019 14:50:38 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:01 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.