Subdetector specification:  
Serial: 2512028455
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A09
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.2 V
Dark current: 5.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 180
Position in Box: 13
EP1 batch: 31
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.253659 V     T = -25 °C: 345.7364536 V
Voltage for Gain 150: T = +20 °C: 389.0711643 V     T = -25 °C: 353.1676016 V
Voltage for Gain 200: T = +20 °C: 393.4300544 V     T = -25 °C: 357.3405853 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.583390949 V-1     T = -25 °C: 4.655985228 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.043327624 V-1     T = -25 °C: 9.411299541 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.17580504 V-1     T = -25 °C: 14.96428321 V-1
Break-through voltage: T = +20 °C: 405.4621322 V     T = -25 °C: 373.0142428 V
   
Notes:


Version history

Time Author Change comment
09. Feb 2021 11:19:19 CET jreher Assigned to capsule by script
05. Feb 2021 11:11:29 CET jreher Updated box and position via API.
18. Dec 2020 14:01:33 CET jreher Updated box and position via API.
11. Aug 2020 17:32:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 20:00:49 CET jreher Updated APD location via API.
25. Nov 2019 17:25:03 CET jreher Updated box and position via API.
30. Jul 2019 15:19:13 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:58:01 CEST markus.moritz
05. Jul 2019 14:50:38 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:01 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.