RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2512028454 - Archived data from Tue, 11. August 2020 17:32:04 CEST


This is all the information about APD 2512028454. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2512028454
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2320025866/2512028454
Unit: #1049 (barcode 1309011681)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: red
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 381.4 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: No
Storage Box: 180
Position in Box: 12
EP1 batch: 31
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.5782624 V     T = -25 °C: 345.7608923 V
Voltage for Gain 150: T = +20 °C: 388.5392006 V     T = -25 °C: 353.1625431 V
Voltage for Gain 200: T = +20 °C: 392.9619588 V     T = -25 °C: 357.3056699 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.349568078 V-1     T = -25 °C: 5.022287274 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.419482707 V-1     T = -25 °C: 9.427915442 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.68173739 V-1     T = -25 °C: 14.95574609 V-1
Break-through voltage: T = +20 °C: 404.4204679 V     T = -25 °C: 372.7307414 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:11:29 CET jreher Updated box and position via API.
11. Aug 2020 17:32:04 CEST jreher Updated APD characteristics via API.
03. Apr 2020 09:46:08 CEST jreher Assigned to capsule by script
13. Feb 2020 14:23:55 CET jreher Updated box and position via API.
27. Nov 2019 20:00:49 CET jreher Updated APD location via API.
25. Nov 2019 17:25:03 CET jreher Updated box and position via API.
30. Jul 2019 15:19:13 CEST spankonin Updated APD batch assignment via API.
23. Jul 2019 10:57:18 CEST markus.moritz
05. Jul 2019 14:50:38 CEST jreher Updated APD location via API.
24. Jun 2019 16:13:01 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:22 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:07 CET Tobias Imported from Hamamatsu datasheet.